Abebe ST, Dagnew AB, Zeleke VG, Eshetu GZ, Cirella GT. 2019. Willingness to pay for watershed management. Resources, 8(77): 1–18.
Azmoudeh A, Zarei M, Rahnama H, Amirnejad H. 2010. Watershed residents' views on watershed management projects carried out in the watershed of Baranjestanak dam. Proceedings of the Sixth National Conference on Watershed Management Science and Engineering and the Fourth National Conference on Erosion and Sediment, Noor. (In Persian).
Bagherian R, Ghoodarzi M, Bagheriankalat A, Soltani MJ. 2014. Factors affecting people's participation in watershed management projects. Journal of Extension and Development of Watershed Management, 2(7): 28–21. (In Persian).
Bekele A, Aticho A, Kissi E. 2018. Assessment of community based watershed management practices: emphasis on technical fitness of physical structures and its effect on soil properties in Lemo district, Southern Ethiopia. Environmental Systems Research, 7(20): 1–11.
Bobrovitskaya NN. 2000. Hydrological meteorological and morphological aspects of studying gully erosion in period of global change. International symposium on gully erosion under global Change, Abstract of Papers, 180 p.
De Luna E, Vanderlinden K, De haro JM, Laguna A, Poesen J, Giraldez JV. 2000. Monitoring of long term gully head advance in south-east Spain using GIS. International Symposium on Gully Erosion under Global Change, 53 p.
Drikund F, Shah Karami A, Lashnizand M, Ground P, Mubarakian SM, Karami H, Khademi K. 2009. Assessing socio-economic effects of development project in Rimla watershed. Proceedings of the 5th National Conference on Watershed Management Science and Engineering of Iran, Gorgan. (In Persian).
Duram LA, Brown KG. 2010. Insights and applications assessing public participation in US watershed planning initiatives. Society and Natural Resources, 12(5): 455–467.
Garcia X, Muro M, Ribas A, Llausàs A, Jeffrey P, Saurí D. 2013. Attitudes and behaviours towards water conservation on the Mediterranean coast: The role of socio-demographic and place-attachment factors. Water International, 38(3): 83–296.
General Department of Natural Resources and Watershed Management of Fars Province. 2020. Information and reports of studies of Mazayjan Zarrin Dasht watershed. 120 p. (In Persian).
Girmay GT,
Alamirew T,
Kassa AK,
Zeleke G. 2018. Institutional functionality in participatory integrated watershed development of Tana Sub Basin, Ethiopia.
Land, 7(4): 130–142.
Hemtazadeh Y, Khalighi N. 2006. Effective factors survey on lake of participation of users in pasture and watershed management design (Case study: User of kchik ragent sphere in Golestan Province). Journal of Agricultural Sciences and Natural Resources, 13(4): 88–100. (In Persian).
Karimi Z,
Sheikh V. 2019. Evaluation of the stakeholders’ attitude towards natural resources and environmental management projects, case study: Hablehroud watershed. Journal of Watershed Engineering and Management, 11(2): 467–477. (In Persian).
Khatibi SA, Golkarian A, Mosaedi A, Sajasi Qidari H. 2016. Qualitative evaluation of watershed management measures and the effects of drought on the situation of villagers (Case study: Mahvid Watershed). Proceedings of the Sixth National Conference on Agriculture and Sustainable Natural Resources, Tehran. (In Persian).
Maleki M,
Dehghani Bidgoli R,
Ghane Moghadam R. 2019. Investigating the effects of natural resources and watershed management plans implemented with the participation of field operators in rural development (Case study: Gharehiran Basin of the Nir City of Ardebil Province). Rural Development Strategies, 5(3): 347–362. (In Persian).
Mohammadi Golrang B, Lai FS, Sadeghi SHR. 2017. Evaluation of variables affecting people's participation in soil pasture and watershed management projects (Case study: Kouskabad Watershed in Khorasan Razavi). Journal of Research and Rural Planning, 6(1): 49–68. (In Persian).
Motiei Langroudi SH. 2017. Economic geography of Iran (agriculture, industry, services). Jahad publications (Ferdowsi University of Mashhad), Fourth Edition, 384 p. (In Persian).
Nadimi N, Zehtabian GhR, Malekian A. 2012. Evaluation of the role of biological watershed management measures on flood reduction (case study: Yanghjeh watershed). Watershed Management Research, 25(3): 97–105. (In Persian).
Nili N, Rahnama F, Liaghati H. 2001. Evaluation of the performance of watershed management projects in relation to erosion and sediment control and water extraction and its role in improving the production and income of watershed residents (Case study: Evaluation several watershed management executive projects in Isfahan Province), Proceedings of the First Conference on Watershed Management and Water Extraction Management in Watersheds, Bushehr. (In Persian).
Raheme Ardakani A,
Esmaeilpour Y,
Mohammadi Y,
Gholami H. 2018. Factor analysis of obstacles to the local communities participation in the biological restoration and desertification plans of carbon sequestration project in the Lapui county, Fars Province. Watershed Management Research, 31(2): 27–40. (In Persian).
Raie S,
Hamraz SS. 2015. An application of discriminant analysis to determine the effective factors on beneficiaries’ attitude to watershed activities (Case study: Kelestan Watershed area in Fars Province). Journal of Rural Economics Research, 1(2): 29–40. (In Persian).
Refahi H. 2015. Water erosion and its control. University of Tehran Press. Seventh Edition .674 p. (In Persian).
Sadeghi SHR, Forootan E, Sharifi F. 2005. Evaluation of watershed management measures by qualitative method (Case study of a part of the watershed), Journal of Geographical Researches, 20(4): 7–47. (In Persian).
Schramm VB, Schramm F. 2018. An approach for supporting problem structuring in water resources management and planning. Water Resources Management, 32(9): 2955–2968.
Shafiei F, Rezvanfar A, Hosseini SM, Sarmadian F. 2008. Survey on soil protection operations from the perspective of farmers in Karkheh and Dez watersheds. Journal of Watershed Management Science and Engineering, 2(3): 3–10. (In Persian).
Soleimanpour SM. 2012. Investigation and comparison of thresholds controlling gully erosion in different climates of Fars province. Ph.D., Thesis, Department of Watershed Management, Science and Research Branch, Islamic Azad University, Tehran, I.R.Iran, 594 p. (In Persian).
Soleimanpour SM, Ghahari GhR, Salehpour Jam A, Tabatabaei MR, Hedayatfard M. 2021. Prioritization of factors affecting the non-participation of exploiters in watershed management projects (Case study: Chikan and Morzian watershed of Sepidan, Fars Province). Journal of Geographic Space, 21(73): 87–102. (In Persian).
Soleimanpour SM, Salehpour Jam A, Noroozi AA, Khalili N, Keshavarzi H. 2019. Experts' viewpoint on prioritizing factors affecting lack of sustainable participation of rural communities in watershed management projects on the Moradabad watershed, Meymand the Province of Fars. Watershed Management Research, 32(3): 53–62. (In Persian).
Soleimanpour SM, Soufi M, Keshavarzi H. 2022. Evaluating the effectiveness of soil dam construction in control of gully erosion in southern of Fars Province. Final Research Report, Soil Conservation and Watershed Management Research Institute, Tehran, 161 p. (In Persian).
Soufi M. 2004. Investigation of morphoclimatic characteristics of gorges in Fars province. Final Research Report, Soil Conservation and Watershed Management Research Institute, Tehran, 130 p. (In Persian).
Sreedevi T, Wani S, Sudi R, Patel M, Jayesh T, Singh S, Tushar S. 2006. On-site and off-site impact of watershed development: A case study of Rajasamadhiyala, Gujarat, India. Global Theme on Agro-ecosystems Report No. 20, Patancheru 502 324, Andhra Pradesh, India: International Crops Research Institute for the Semi-Arid Tropics, pp. 1–44.
Varua ME, Maheshwari B, Ward J, Dave S. 2017. Groundwater conservation attitudes behavior and water management: The case of farmers in rural India. Transaction on Ecology and Environment, 220: 141–150.